Risk Assessment and Control Activities in the Management of Lambo Reservoir Development Funds: SPIP-Based Evaluation
DOI:
https://doi.org/10.61166/policy.v2i2.36Keywords:
SPIP, Risk Assessment, Control Activities, Lambo Reservoir, Accountability, Transparency.Abstract
This study evaluates the compliance of risk assessment and control activities within the Government Internal Control System (SPIP) in managing the Lambo Reservoir development funds at BWS NT II with Government Regulation No. 60 of 2008, identifies the inhibiting factors, and formulates improvement strategies. Using a qualitative approach through interviews and observations with employees and affected communities, supported by project documents, financial reports, news sources, and regulations, the study assesses five SPIP components: control environment, risk assessment, control activities, information communication, and monitoring. The results show that SPIP implementation is not yet optimal, particularly in the absence of comprehensive risk mapping—such as risks of delayed payments, land disputes/validity issues, and potential fund misuse along with inconsistent application of control procedures like land document verification, segregation of duties, reconciliations, and periodic audits, as well as inadequate transparency and public outreach that contribute to distrust. Key obstacles include incomplete or outdated land data, weak inter-agency coordination, limited human and technological resources, and geographical logistical challenges. The recommended improvements include forming an integrated land validation team with the National Land Agency, digitizing documents and implementing case tracking, strengthening key controls through multi-layer verification, real-time reconciliation, and periodic risk-based audits, enhancing public outreach and complaint channels, and improving project monitoring and logistical support to provide a roadmap for strengthening SPIP effectiveness and ensuring accountable and timely project completion.
References
BUKU
Hardani, S.PD., M. S., Helmina Andriani, M. S., Jumari Ustiawaty, S.Si., M. S., Evi Fatmi Utami, M.Farm., A., Ria Rahmatul Istiqomah, M. I. K., Roushandy Asri Fardani, S.Si., M. P., & Dhika Juliana Sukmana, S.Si., M.ScNur Hikmatul Auliya, G. C. B. (2009). Metode Penelitian Kualitatif & Kuantitaif. In Advanced Drug Delivery Reviews (Vol. 61, Issue 9).
INDONESIA, P. P. R., & 2008, N. 60 T. (n.d.). SISTEM PENGENDALIAN INTERN PEMERINTAH DENGAN RAHMAT TUHAN YANG MAHA ESA PRESIDEN REPUBLIK INDONESIA,.
IAPI (2011:319), Sistem Pengendalian Internal dan Hubungannya Dengan Ruang Lingkup Pemeriksaan
Inspektorat, T. P. (2019). Buku saku SPIP Inspektorat Kota Yogyakarta Buku saku SPIP Inspektorat Kota Yogyakarta. 22.
JURNAL DAN SKRIPSI
Lumanaw, K. ., & Tinangon, J. (2016). the Evaluation Application Information System Accounting Payroll for the Intern Control At Pt. Bpr Danaku Mapan Lestari in Bitung. Jurnal EMBA, Vol.4 No.2(2), 224–235.
Luthfiyah Triska Arisanti, Dra Yulinartati.,MM.,Ak.,CA, Ari Sita Nastiti., S. M. A. (2019). EVALUASI SISTEM PENGENDALIAN INTERNAL ATAS PENGGAJIAN DAN PENGUPAHAN PADA PT BUMI KARYA UTAMA JEMBER. Program Studi Akuntansi Fakultas Ekonomi Universitas Muhammadiyah Jember, 11(1), 1–14.
Ridho, A. (2013). Evaluasi Efektivitas Sistem Pengendalian Internal Dalam Rangka Mengatasi Tindak Kecurangan (studi Kasus Pada Pt Nurimas Taksi Sidoarjo). Calyptra, Vol. 2(No. 2), h.
Togo, A. (2024). Pembangunan PSN Waduk Mbay-Lambo di Nagekeo Sudah Mencapai 45,18 Persen. https://florespos.net/2024/04/06/pembangunan-psn-waduk-mbay-lambo-di-nagekeo-sudah-mencapai-4518-persen/
Mulyadi. 2016. Akuntansi Manajemen Konsep, Manfaat, dan Relevansi. Jakarta: Salemba Empat. Halaman 129 dan 163.
Aditya, R. (2021). Analisis Pengaruh Pengendalian Internal Terhadap Kinerja Proyek Infrastruktur di Daerah. Skripsi, Universitas Gadjah Mada.
Huberman, Micheles dan Miles Matthew. 1992. Analisis Data Kualitatif. UI Press. Jakarta
Nugroho, & Hartati. (2020). Koordinasi Antarinstansi dan Prioritas Lokasi Strategis dalam Proyek Berbasis Lahan. Penerbit Akademis.
Lestari, R. (2020). Evaluasi Pengendalian Internal dalam Pengelolaan Dana Proyek Infrastruktur di Pemerintah Daerah. Jurnal Akuntansi dan Keuangan, 15(2), 134-145.
Novita Silfiani Christina, I Wayan Mundra, & Mohammad Erfan. (2020). Studi Penentuan Lengkung Debit (Rating Curve) untuk Menunjang Sistem Peringatan Dini di Daerah Aliran Sungai (DAS) Temef Kabupaten Timor Tengah Selatan, Provinsi Nusa Tenggara Timur. Student Journal GELAGAR, 10(X), 1-9.
Moleong, L. J. (2018). Metodologi Penelitian Kualitatif. Bandung: PT Remaja Rosdakarya.
Creswell, J. W. (2014). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches (4th ed.). Thousand Oaks, CA: SAGE Publications.
Rahmawati, A. (2018). Inspeksi Lapangan dan Efektivitas Operasional Proyek. Jurnal Teknik Sipil Indonesia, 5(3), 120-135.
Lina Nuryawati & Irwan Taufiq Ritonga. (2022). Analisis Hubungan Maturitas Sistem Pengendalian Intern Pemerintah (SPIP) dan Kualitas Pengelolaan Keuangan. Studi pada Pemerintah Daerah Di Indonesia. Tesis Magister. Magister Akuntansi.
PERATURAN PERUNDANG-UNDANG
Peraturan Republik Indonesia (2008), Peraturan Pemerintah Nomor 60 Tahun (2008) tentang Sistem Pengendalian Intern Pemerintah. Jakarta : Kementrian Sekretariat Negara
Pemerintah Republik Indonesia. (2008). Peraturan Pemerintah Republik Indonesia Nomor 60 Tahun 2008 tentang Sistem Pengendalian Intern Pemerintah (SPIP). Diakses dari https://peraturan.bpk.go.id/Home/Details/4938/pp-no-60-tahun-2008
UU RI. (2004). UU No. 25 Tahun 2004 tentang Sistem Perencanaan Pembangunan Nasional. Peraturan.Bpk.Go.Id, 1–32.
2008, PERATURAN PEMERINTAH REPUBLIK INDONESIA NOMOR 60 TAHUN, Lingkungan Pengendalian
Peraturan Pemerintah Republik Indonesia Nomor 12 Tahun 2019 tentang Pengelolaan Keuangan Negara
Undang-Undang Nomor 23 Tahun 2014 tentang Pemerintahan Daerah
Pemerintah Republik Indonesia (2019), Peraturan Pemerintah Republik Indonesia Nomor 12 Tahun 2019 tentang Pengelolaan Keuangan Negara. Jakarta : Kementrian Sekretariat Negara.
ARTIKEL BERITA
Nulangi, T. M. (2024). Progres Pembangunan Waduk Lambo di Nagekeo Secara Kumulatif Mencapai 52,96 Persen Artikel Ini Telah Tayang Di RakyatFlores.Com. Dengan Judul : Progres Pembangunan Waduk Lambo di Nagekeo Secara Kumulatif Mencapai 52,96 Persen 13 Juli 2024. https://rakyatflores.com/regional/progres-pembangunan-waduk-lambo-di-nagekeo-secara-kumulatif-mencapai-5296-persen/
Moa, E. (2024). Ganti Rui Lahan Belum Dibayar, Pemilik Lahan Tutup Jalan ke Waduk Lambo Nagekeo,. TRIBUNFLORES.COM, MBAY. https://flores.tribunnews.com/2024/02/27/ganti-rugi-lahan-belum-dibayar-pemilik-lahan-tutup-jalan-ke-waduk-lambo-nagekeo
KonsultanSyncoreConsulting. (2023). Tahapan Pengelolaan Keuangan Negara di Indonesia.Retrieved from https://syncore.co.id/Tahapan-Pengelolaan Keuangan-Negara-di-Indonesia
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Susana Purnamasari Baso

This work is licensed under a Creative Commons Attribution 4.0 International License.







